|
Product Detail :
|
The project involves the investigation, survey, design, and construction of 14 nature-based sewage treatment plants (NSTPs) with a total capacity of 2.895 MLD across various urban local bodies in Andhra Pradesh. The NSTPs will utilize modern technology and require minimal power supply, employing a combination of microorganisms, plants, and gravel for sewage treatment. The scope includes detailed design, construction, installation, testing, and commissioning of the plants, along with a 90-day trial run and a 2-year defect liability period. Nature-based Sewage Treatment Plants, Civil Works, Mechanical Works, Electrical Works
|
| Tender Detail : |
The project involves the investigation, survey, design, and construction of 14 nature-based sewage treatment plants (NSTPs) with a total capacity of 2.895 MLD across various urban local bodies in Andhra Pradesh. The NSTPs will utilize modern technology and require minimal power supply, employing a combination of microorganisms, plants, and gravel for sewage treatment. The scope includes detailed design, construction, installation, testing, and commissioning of the plants, along with a 90-day trial run and a 2-year defect liability period. |